Railworks Ts2015 West Highland Line Extension Route

Posted on -

The summit atThe West Highland Railway was a that constructed a railway line from (on the River Clyde west of Glasgow, Scotland) to. The line was built through remote and difficult terrain in two stages: the section from Craigendoran to Fort William opened in 1894, with a short extension to on the opening in 1895.It had originally been intended to extend to, to give good access to sea-going fishery vessels, but the end point was altered to Mallaig, and this section opened in 1901. The was notable for the extensive use of mass concrete in making structures for the line; at the time this was a considerable novelty.The line never made a profit, and relied on Government financial support, which was given (amid much controversy) to improve the depressed economic conditions of the region. It was worked by the, which later took the company over.

Except for a short stub at Banavie the entire line remains in use, and it is considered to be one of the most scenic railway lines in Britain. System map of the West Highland RailwayPrior to the nineteenth century the western highlands of Scotland formed a wild tract of land, with mountainous terrain threaded by deep river valleys. The soil was generally poor and not conducive to productive agriculture, and land transport was poor. After the were constructed for the purpose of military control, but these were limited to the area from Crieff to south of the. The most efficient transport medium was coastal shipping.Railways became a practicable means of transport around the end of the eighteenth century especially in mineral districts, in many cases at first as short-distance adjuncts to waterways; the of 1826 is notable in the development in Scotland. In 1842 the opened, showing the way for inter-urban general purpose railways, and the easing of the money market in the following years led to a frenzy of promotion of railways, in which a huge number of schemes were put forward, not all of them viable. The railway mania The climax of this was in 1845, the year in which the obtained its Act of Parliament, authorising the creation of capital of £1.5 million to build a railway from Edinburgh and Glasgow to Carlisle.

Other Scottish trunk railways were authorised in the same year, and this encouraged the promotion of increasingly wild schemes intended to be submitted to Parliament in the following session. The West Highlands of Scotland were not omitted from the schemes proposed. Prospectuses were issued for the Scottish Western Railway and the Scottish North Western Railway, as well as the Scottish Grand Junction Railway and others. Some of the prospectuses told of abundant income and easy construction through imaginary gently rolling land. One line at least admitted the mountainous character of the area but proposed the use of the to overcome the difficulty.The tightness of money in 1846 and the following years put paid to all the West Highland schemes.As other railways were opened and operating, there remained a large area on the map of Scotland not served by any, and branch lines from existing trunk lines began to be considered.

In 1870 the first section of the was opened, extending a local branch line, and this railway, a subsidiary of the Caledonian Railway, opened throughout to Oban in 1880.Also in 1870 the main part of the opened, as far as Stromeferry. Thus two west coast locations were reached by penetrating branches from the centre. The Glasgow and North Western Railway There remained considerable tracts of the west Highland area without useful transport routes, and social conditions were identified as being unacceptable.

A government commission appointed in March 1883, examined the plight of smallholders in the Highlands, and their investigation showed that above all transport was a pressing need. The Crofters Holdings (Scotland) Act 1886 established the and gave enhanced rights to crofters. This change of mood led to the idea that a railway serving the area was a social need, and in turn this led to the promotion of the Glasgow and North Western Railway.

This 167 mile line, costed at £1,526,116, was to reach from Glasgow (Maryhill) to by way of,. Fort William, although a small town, was the centre of a wide area.The G&NWR was not directly established by government: it was sponsored by financial interests in London, and by the (NBR). The NBR was a bitter competitor of the (CR) and the CR regarded the western side of Scotland as its own preserve, so that the NBR interest in the new line automatically led to opposition. The and, a coastal steamer operator, were both effective monopolies on their respective businesses and naturally opposed the G&NWR.

Ts2015

The Bill came before Parliament in the 1883 session.The hearings were lengthy, and opposition counsel did not hesitate to pour scorn on Highlandmen who came in support of the line. The undeveloped nature of the area (which the railway was designed to rectify) was shown as a reason to reject the proposed line, and finally on 1 June 1883 the Committee threw out the Bill. The G&NWR was finished.

The West Highland Railway proposed The establishment of the Crofters' Commission followed this disaster, and social concern at the plight of the West Highland population was not diminished by the failure of the G&NWR scheme. In October 1887 public opinion in Fort William begun to be mobilised when the Provost N B MacKenzie publicly argued for a Glasgow to Fort William line. Efforts were made to secure the support of the North British Railway and in February 1888 this was given, provided that the Government contributed £300,000 to the scheme. The North British guaranteed £150,000 if local subscriptions were inadequate, as well as guaranteeing 4.5% on the shares (by a complicated formula).At length the idea of a West Highland Railway was developed. This time it would not attempt to reach Inverness, but was to run from Craigendoran, on the North British Railway line to Helensburgh.

It would run beside the (instead of the southern part of Loch Lomond) to Ardlui, Crianlarich, Rannoch Moor and Loch Treig to Fort William. A branch was to continue to and the south-west to, a west coast sea port intended to give access to fishing vessels and island steamers.The truncated route passed over the estate of friendly landowners as far as Fort William, but west of that place matters were more feudal, and the Roshven extension was later abandoned in the face of their opposition.On 30 January 1889 seven gentlemen, including set out to walk from Spean Bridge to Rannoch Lodge, a distance of 40 miles across largely trackless terrain. The purpose was to examine the route, and to discuss the route of the line with Sir Robert Menzies. In extremely poor weather they set off, wearing city clothes, and a series of misjudgements nearly led to catastrophe for them.

This event was used in the Parliamentary hearings for the authorisation of the line to illustrate the remoteness of the proposed route.The projections on the earnings of the line were simply based on the receipts of the Callander and Oban line, grossed up for the longer mileage.The Highland Railway and the Caledonian Railway both opposed the line in Parliament, to protect their lines to Stromeferry and Oban respectively, but the West Highland Railway Bill obtained the Royal Assent on 12 August 1889. The Roshven extension was dropped and the authorised line was from Craigendoran to Fort William only. Immediately a further Bill was prepared for the 1890 session for certain deviations—one on Rannoch Moor was rejected in Parliament—and for an extension to Banavie Pier. This Bill was enacted as the West Highland Railway Act 1890. Construction The first sod was dug on 23 October 1889 and the contractor for the construction, set about assembling the workforce for the construction. The exceptional remoteness of the area, and the scarcity of even basic roadways posed especial difficulties. The engineers were Formans and McCall.In August 1891 a major dispute arose between the contractors and the railway company, over the price to be paid for removing spoil; the contractor wanted a higher payment for the material containing boulders.

The dispute went to Dumbarton Sheriff Court, where the case was found in favour of the railway company, but by now the workforce was largely dispersed. A negotiated settlement brought Lucas and Aird back to the site and work resumed in October 1891.There was still much to do, in particular the crossing of the boggy section of Rannoch Moor which had not yet been started, By the summer of 1893 the railway company was running out of capital, and it appeared that the work must cease, but one of the directors, Mr Renton, gave part of his personal fortune to save the scheme. In fact when the line was completed the total cost was said to be £1.1 million. Crianlarich station, Easter 1957The line was finally inspected by Major Marindin of the Board of Trade on 3 August 1894 (after some earlier visits) and on 7 August authority to open the line to passenger operation was received.

Maximum speed was to be limited to 25 mph. Opinion had been expressed within the company that a limited opening to Gareloch at first would be preferable, but the politics of securing the Government support for the Mallaig line meant that no hesitation could be displayed.Trains started running on that day, although a formal opening was arranged for Saturday 11 August by the wife of the chairman,.The line ran from Craigendoran Junction to Fort William, with fifteen stations formed in the style of Swiss chalets.

Railworks Ts2015 West Highland Line Extension Route

The line was single, with Saxby and Farmer tablet apparatus. There were three passenger trains each way, the first down and last up train conveying a through coach for Kings Cross via Edinburgh; one goods train ran each way daily.

On 1 November 1894 the passenger service was reduced to two trains each way, the 'winter' timetable. The rival Caledonian Railway introduced a London to Fort William service via Oban, with a steamer connection from there to Fort William, with throughout timings not far off the West Highland times. An attempt was made by the West Highland to operate a residential service from Arrochar to Craigendoran (three return journeys daily and 4 on Saturdays from 1959), there connecting with North British Railway trains to Glasgow, but the difficult location of the WHR stations, some distance from the communities they purported to serve, made this unattractive for daily travel. An attempt to generate goods traffic from Greenock (via steamer to Craigendoran) to Fort William was also unsuccessful because of a price disadvantage compared to throughout steamer transits.Rannoch station was at this time remote from public roads: the West Highland built a road eastward from the station to Loch Rannoch. (The road is now part of the B846 road.

Was also inaccessible by public road at this time.)From 29 December 1894 through to 7 February 1895 blizzards of exceptional severity struck the area of the line, and many trains became marooned, as the line was blocked. Improved snow defences were subsequently erected, including the Cruach Rock snowshed. Banavie extension The 1890 Act for the West Highland Railway included a short branch line from a junction near Fort William to, at a location adjacent to the. This was duly completed and was opened on 1 June 1895, closing to passengers in 1939 and to freight in 1951. The line arched round to the north-east and there was a station, alongside the canal and some distance north-east of the present-day station.

This location was near the head of the series of locks known as by which the canal rises 20 m and a transfer siding adjacent to the canal needed to climb by a 1 in 24 gradient to reach a backshunt. Crianlarich connection It had always been intended to make a connecting line with the Callander and Oban line of the Caledonian Railway at, where the two lines crossed. The Caledonian Railway had earlier been suspicious of the motives of the North British Railway in this regard; the distance from Glasgow to Crianlarich was substantially shorter by the West Highland Railway and at the Parliamentary stage the West Highland Railway (seen as the creature of the NBR) had applied for running powers to Oban.The original design of the WHR station at Crianlarich would have allowed through running from Glasgow to Oban via the West Highland, but this was not implemented. The Caledonian Railway suggested a joint station that would have allowed both routes (from Stirling or from Helensburgh) access to both destinations (Oban and Fort William, and there was a proposal that passenger trains from Central Scotland by both routes should combine at Crianlarich and then divide with portions for both Oban and Fort William.Cattle and other traffic from destined for Stirling and Perth were intended to be transferred, but the connection was not made ready until 20 December 1897 and in the meantime that traffic had to be routed via Glasgow. It was complained that this extra mileage was more profitable to the NBR.From 1962 until 1971 a Swindon-built cross-country DMU, normally used on the to main line, was transferred in the summer months to work a daily round trip from to via this connection.

It was joined from late 1965 by all Glasgow to Oban trains, re-routed following closure of the to Crianlarich route - initially by a landslide in Glen Ogle but officially from April 1966 as part of the so called cuts.Financial performance With no through trains to Oban and a very limited 'residential' traffic to Garelochhead, the income on which the finances of the line had been based were out of reach. The main line to Fort William opened during the summer season of 1894, but doing so had been expensive, involving excessive construction costs against the contractor's advice in the difficult winters of 1892-3 ad 1893-4. Moreover, the Banavie branch would not open until the following year (1895) and total construction costs exceeded £1 million, nearly double the estimate.

Train Sim 2019 Routes

By now the North British Railway was the banker for the West Highland, but some pretence of independence was retained, to avoid a repudiation of the financial support by the Treasury.The total revenue of the West Highland Railway in 1896 was £45,146. It climbed to £69,626 in 1899 and eventually to £92,260 in 1901 (equivalent to £9,840,000 in 2018), but it was always heavily loss-making; the losses were made up by the NBR. Quite apart from the NBR's obligations under the guarantee, loans had been granted to the WHR; by June 1902 the WHR owed £1,206,463 (equivalent to £128,650,000 in 2018). Extending to Mallaig. Glenfinnan viaductAlthough on salt water, Fort William was too far from the open sea to be useful as a fishing base, and the idea of a westward extension was revived. Loch Nevis was considered an ideal location from the shipping point of view, but the intermediate land would have made railway construction exceptionally difficult, so the West Highland Railway reluctantly settled on Mallaig, less than 40 miles from Fort William.

It was clearly unlikely that the extension could be profitable and the NBR (as the only viable private provider of the necessary capital) made it clear that it would only invest if Government subsidy were made available.A Treasury Committee examined the possible railways—not just the Mallaig line—and recommended Government support for the line, although Mallaig 'could only be recommended for want of a more favoured position being attainable.' The North British Railway had supported the first part of the West Highland Railway for commercial reasons, but it was now concerned that it would be expected to pick up the loss of the Mallaig extension, and it considered a loss to be inevitable. Nonetheless commitments had been given, and on 28 April 1892 the NBR agreed to work the extension of 50% of gross receipts, and that it would continue to support the line when the Government guarantee of 3% on capital over 25 or 30 years expired.Considerable negotiation with Government was necessary over a protracted period in regard to the subsidy, and the matter was badly affected by a change of Government, when the Liberal administration replaced the outgoing Conservative group. A last-minute attempt to get a West Highland (Banavie and Mallaig) Bill in Parliament for the 1893 session was finally refused by the House of Lords. A new Bill, the 'West Highland Mallaig Extension Bill' went to the 1894 session.Authorisation for the subsidy required a quite separate Bill; this was the West Highland Railway (Guarantee) Bill, also in the 1894 session.

It was contingent on the construction Bill being passed; satisfactory improvements to Mallaig Harbour had to be agreed, and NBR was to undertake to work the line for 50% of gross receipts in perpetuity. Mallaig stationThe Highland Railway opposed the Bill as it was about to extend from Stromeferry to Kyle of Lochalsh. The West Highland Railway (Mallaig Extension) Act passed on 31 July 1894, but the guarantee bill was thrown out; many MPs objected to a free gift to a railway company. However the scheme, aimed at developing a backward area of the country, had Government support and the Guarantee Bill was submitted to Parliament again in the 1895 and 1896 sessions and eventually it passed, on 14 August 1896. The Treasury guaranteed the shareholders 3% on £260,000 of West Highland Railway (Mallaig Extension) capital and to make a grant of £30,000 towards the £45,000 cost of the pier at Mallaig; rates were also to be held to the level of unimproved land.The first sod of the extension line was cut on 21 January 1897 at Corpach by Lady Margaret Cameron. The contractors were Robert McAlpine and Sons, and the engineers were Simpson and Wilson.Although the section from Banavie to the head of Loch Eil was easy, from there onwards the terrain was very difficult, a problem exacerbated by the remoteness and difficult access.

Very hard rock was encountered and away from Loch Eil there was a considerable volume to penetrate. Steam-powered drilling equipment was difficult to bring to the locations and keep fuelled, and McAlpine used water turbines to provide compressed air power for drilling. The construction of the line actually cost £540,000 (equivalent to £57,580,000 in 2018).Although the rock was hard, it was shattered and fractured, making it unsuitable for conventional masonry construction in bridges and viaducts, and this led McAlpine to use mass concrete to build many bridges; at the time this was a revolutionary form of construction. Borrodale Burn bridge became the world's longest concrete span at 127 feet, and Glenfinnan Viaduct was a huge structure in concrete at 416 yards long with 21 arches.The Mallaig line continued from the existing Banavie branch; the junction (formerly Banavie Junction) near Fort William for the branch was renamed Mallaig Junction, and the point of divergence of the new line from the final section of the Banavie branch was named Banavie Junction. The original Banavie station was renamed Banavie Pier, and there was a new Banavie station on the through line. Operating from Mallaig.

Banavie swing bridgeThe first trains ran to and from Mallaig on 1 April 1901. In the first timetable there was a through carriage and a sleeper to and from Kings Cross, but this was not continued in subsequent years. Fish traffic was very important but it never reached the volumes hoped for; the harbour was difficult in certain conditions (which also limited the reliability of the Hebrides ferry service).

The Mallaig site on land was also very restricted and gave rise to complaints from the fish merchants, and delays to punctual running because of difficulty loading trains. Stations and locations on the first line were:.

Craigendoran Junction; divergence from the Helensburgh line of the North British Railway;. Craigendoran; separate station from that on the Helensburgh line, and at a higher level; closed 15 June 1964;. Helensburgh Upper;. Row; renamed Rhu 1927; closed 9 January 1956; reopened as Rhu Halt 4 April 1960; closed 15 June 1964;.

Faslane Junction; divergence of Faslane branch;. Shandon; closed 15 June 1964;.

Garelochhead;. Whistlefield; opened 21 October 1896; Whistlefield Halt from 1960; closed 15 June 1964;. Glen Douglas Halt; opened 1894 or 1895.

From September 1926 for families of railway staff, particularly in connection with the LNER school there; opened to the public 12 June 1961; closed 15 June 1964;. Arrochar and Tarbet;. Ardlui;. Glen Falloch; unadvertised station for workmen employed on Loch Sloy hydro-electric power scheme; opened 10 April 1946; closed circa 1948;.

Crianlarich; also known as Crianlarich Upper from 1953; divergence of spur to Oban line;. Upper Tyndrum; previously known as Tyndrum Upper;.

Railworks Ts2015 West Highland Line Extension Route Map

Bridge of Orchy;. Gorton; Private station opened 1894. 6 February 2009.